Construction Accidents in Cook County.

A Cook County site case is built for trial, and a public owner shortens the clock.

A fall, a collapse, or a struck-by injury on a Chicago or suburban Cook County job site usually means two claims: workers’ comp from your employer, and a suit against a company that is not your employer. In Cook County that suit stays out of the court’s arbitration program unless both sides agree. When the owner is a public body, the time to sue drops to one year. Our office is in Naperville.

Excluded
Construction suits sit outside the Law Division’s mandatory arbitration program unless the parties agree.
1 year
To sue a public owner such as the City, a park district, a school board, Pace, or Metra.
OSHA
The federal file on the site. We pull the citation and the contractor’s history.
DuPageWillKaneKendallCookCourthouseOur officeLake
Michigan
10 miles
Map of DuPage, Will, Cook, Kane, and Kendall counties with Cook County highlighted, marking the Richard J. Daley Center in Chicago and the Marker Law office in Naperville.

A Cook County construction suit skips arbitration.

Smaller Law Division injury cases in Cook County go to an arbitration hearing before trial, but Part 25 of the court’s rules keeps construction cases out of that program “unless the parties agree to arbitration.” The size of the claim does not change that.

Without that agreement there is no arbitration hearing and no arbitrators’ award for either side to accept or reject. The suit moves through written discovery and depositions toward a trial date in whichever Cook County court has it, and the amount and the place decide which court that is, as set out on our Cook County page. The steps from the demand to the jury are on how a construction case moves through court.

The Richard J. Daley Center in downtown Chicago, a dark steel and glass tower seen from street level under an overcast sky
The Daley Center, where the Law Division is based. Photo by GregMcCollum, CC0, via Wikimedia Commons, cropped.

When the owner is the City, a school, or a transit agency.

Public bodies own or pay for much of the construction in Chicago and suburban Cook County. When one of them owned the site, a suit against it runs on a one-year clock instead of the usual two years.

A tower crane above a building under construction wrapped in scaffolding
  1. City of Chicago

    Municipality

    Its Department of Transportation is responsible for the city’s streets, alleys, and sidewalks, and its bridges and viaducts.

  2. Cook County

    County

    Its Capital Planning department builds county facilities through the capital construction projects in its annual capital improvement program.

  3. Chicago Park District

    Park district

    Chicago Grows Together, its infrastructure improvement program, pays for work in parks across the city.

  4. Chicago Board of Education

    School board

    Its $600.4 million capital plan for fiscal 2027 funds roofing, mechanical systems, accessibility, and restroom work in Chicago Public Schools buildings.

  5. Metropolitan Water Reclamation District

    Local public entity

    Its Engineering Department plans, designs, and builds the projects in the District’s capital improvement program.

  6. Metra

    Commuter Rail Division

    Station and rail work, such as the renovation of the South Water Street entrance to Millennium Station.

  7. Pace

    Suburban Bus Division

    Transit facilities in suburban Cook, such as the reconstruction of its Harvey Transportation Center.

  8. Chicago Transit Authority

    Its own statute

    A $6.75 billion capital program for 2026 through 2030, including the Red Line Extension from 95th Street to 130th Street.

For the City, the County, the Park District, the school board, and the Water Reclamation District, the Tort Immunity Act requires a suit to be “commenced within one year from the date that the injury was received or the cause of action accrued” (745 ILCS 10/8-101(a), with the bodies it covers in 10/1-206). Metra and Pace have the same one-year limit under the Northern Illinois Transit Authority Act, formerly the RTA Act (70 ILCS 3615/5.03), and the CTA under its own (70 ILCS 3605/41).

This is a suit against an owner that was not your employer. The comp claim against your employer runs on its own clock, explained on workers’ compensation. Whether an owner or a general contractor answers for the injury turns on who controlled the work, covered under who controlled the site.

What the public record shows about a Chicago job site.

Three public records name who was on a site and which rules applied there, before anyone hands over a document.

One building permit record

City of Chicago

PERMIT_TYPE
ISSUE_DATE
STREET_NUMBER, STREET_NAME
WORK_DESCRIPTION
CONTACT_1_TYPE / _NAME
CONTRACTOR-GENERAL CONTRACTOR
CONTACT_2_TYPE / _NAME
ELECTRICAL CONTRACTOR
CONTACT_3_TYPE / _NAME
MASONRY CONTRACTOR

Up to 15 contacts per permit, each with a type and a name.

Field names from the City of Chicago Data Portal’s Building Permits dataset. Names and numbers are left blank.
  1. The building permit

    City of Chicago Data Portal

    The Building Permits dataset lists every permit the city has issued since 2006, updated daily, with up to 15 contacts per permit by role, such as general, electrical, or masonry contractor. The Department of Buildings’ records search returns permits, inspections, and violations by address. Outside Chicago, the village or city issues the permit, so the record sits with its building department, such as Oak Park’s or Evanston’s.

  2. The Chicago Building Code

    Chapter 14B-33

    Work Site Safety and Operations governs safety during construction, demolition, and rehabilitation. It requires floor and roof openings to be “covered or properly protected,” pedestrians to be protected, and scaffolding built to protect people working on, under, or past it. In Kalata v. Anheuser-Busch (1991), the Illinois Supreme Court held that violating an ordinance “designed to protect human life or property is prima facie evidence of negligence,” though not negligence per se.

  3. The OSHA file

    Chicago North and Chicago South offices

    OSHA lists two area offices covering Cook County, in Arlington Heights and Tinley Park, and its Establishment Search finds federal inspections and citations by employer name. An OSHA violation is evidence of negligence in Illinois, not negligence per se. In 2024, 26 people died in private construction work in Illinois, by the Bureau of Labor Statistics’ count.

Winter on an open Cook County site.

Chicago averages 38.4 inches of snow a season, most of it from December through February, and a low at or below freezing on about 121 days a year, by the National Weather Service’s 1991–2020 normals for Chicago, measured at O’Hare.

OSHA’s winter guidance tells employers to clear snow and ice from walking surfaces and spread deicer as soon as they can after a storm, and to clear ladders before they are used. Snow on a roof can hide a skylight a worker falls through, and where snow has to be removed so construction can start or continue, OSHA’s construction rules apply, with fall protection from 6 feet up.

Ice on a deck, a ladder, or a roof edge raises the questions every fall does: who controlled that surface and whether it was cleared. Falls from height and scaffold collapses are covered on construction accidents, the job from the crew’s side on construction workers and union and trade workers, and Jason talks through falls on job sites in the Road Crew episode of the podcast.

Average snowfall

Average snowfall
Oct0.2 inches
Nov1.8 inches
Dec7.6 inches
Jan11.3 inches
Feb10.7 inches
Mar5.5 inches
Apr1.3 inches

Days with a low at or below 32°F

Days with a low at or below 32°F
Oct3 days
Nov15 days
Dec25 days
Jan28 days
Feb24 days
Mar20 days
Apr6 days
October through April, 1991–2020 normals for Chicago (O’Hare), National Weather Service Chicago.

Questions about Cook County construction accidents.

Reviewed by Jason A. Marker, attorney, licensed in Illinois since 2000.

Does Cook County’s mandatory arbitration apply to a construction injury suit?

No, unless the parties agree. Part 25 of the Circuit Court of Cook County’s rules lists construction cases among the personal injury cases not subject to mandatory arbitration. Without that agreement, the suit goes through discovery toward a trial in whichever Cook County court hears it.

What if I was hurt on a city, school, or transit project in Chicago?

A suit against the City of Chicago, the Chicago Board of Education, the Park District, or another local public entity generally has to be commenced within one year (745 ILCS 10/8-101(a)). Metra and Pace have a one-year limit under 70 ILCS 3615/5.03, and the CTA under 70 ILCS 3605/41. The comp claim against your own employer runs on its own, longer clock.

How do I find out which contractors were on a Chicago job site?

Start with the building permit for the address: the City of Chicago Data Portal lists each permit’s contacts by role, such as general contractor or electrical contractor. OSHA’s Establishment Search shows federal inspections and citations by employer name. For a suburban Cook site, the permit is with that village or city’s building department.

Can a Naperville firm handle a construction case from a Chicago site?

Yes. Where your lawyer’s office sits does not decide where the case is heard, and our attorneys work at the Daley Center, where Cook County’s Law Division is based. Our office is about 26 miles from it in a straight line. Construction cases are taken on contingency: no recovery, no fee.

Tell us what happened.

Free, confidential, any hour. Jason reviews every new inquiry himself, and there is no fee unless we recover money for you.

Call 331-INJURED 24/7Request a free consultation

Or text 331-320-0787. Se habla español.